Steel-frame factory interior from TSG Construction's Indonesian benchmark project
Construction Partner

TSG Construction: Industrial Design and Build in Indonesia

PT TSG Construction Indonesia is Kinnara Capital's on-the-ground construction partner. It belongs to TSG Group, an industrial design-and-build contractor with 20 years of work in China, operating in Indonesia since 2024.

20 years
Industrial design-and-build (EPC) experience in China
380+
Completed projects, as reported by TSG
Since 2024
Operating in Indonesia, from PIK 2, Tangerang
5 offices
Jakarta, Bangkok, Suzhou, Tokyo and Mumbai
Background

Two Decades of Industrial Building

TSG Group, trading as Tang's Industrial Solutions, grew out of Jiangsu Xutian Construction. Over 20 years in China it has designed and built factories, cleanrooms and industrial parks for manufacturers, and it reports more than 380 completed projects.

TSG opened its Indonesian branch at PIK 2 in Tangerang in 2024, the same year it opened in Thailand. The Indonesian company holds local construction and equipment installation qualifications, and works with a team of 15 bilingual engineers.

Its clients include Japanese, German and multinational manufacturers. TSG reports a 98.2% retention rate among its Japanese corporate clients.

Indonesian entity
PT TSG Construction Indonesia
Parent group
Jiangsu Xuhua Holdings Group Co., Ltd. (TSG Group), formerly rooted in Jiangsu Xutian Construction
Indonesian office
PIK 2, Kosambi, Tangerang Regency, Banten. Branch established 2024
Indonesian licences
Construction and equipment installation qualifications
Local team
15 bilingual engineers, with 70% local supply-chain integration
Experience and Scale

Benchmark Projects

Selected projects from TSG's company profile, across Indonesia, Japan, India, Thailand and China. Floor areas and build times are as TSG reports them.

General machinery components factory, Indonesia. Photo: TSG

Indonesia

General machinery components factory

30,000 m² · 9 months

TSG’s Indonesian benchmark project.

Automotive parts factory, Japan. Photo: TSG

Japan

Automotive parts factory

28,000 m² · 10 months

Built for a Japanese-owned manufacturer to JIS and ISO standards.

Electronic cleanroom, China. Photo: TSG

China

Electronic cleanroom

12,000 m² cleanroom · Class 1000

Designed to seismic grade 8, with full-process BIM.

India

Electronic component factory

35,000 m² · 12 months

Produces for export to European and American markets.

Japan

Food-grade factory

22,000 m² · 8 months

Built to HALAL and FDA food-safety standards.

Thailand

Green energy factory

25,000 m² · PV roof

Rooftop solar, rainwater harvesting and green building certification.

China

Medical device factory

8,000 m² cleanroom · ISO 13485

Aseptic production with precision temperature control.

China

Smart industrial park

120,000 m² GFA · 15 tenants

Home to 15 multinational companies.

Quality

Standards TSG Builds To

International engineering standards

Works to Indonesian (SNI), Japanese (JIS) and Chinese (GB) standards, and to ASME and EN.

ISO 9001:2015 quality control

Quality management to ISO 9001:2015, with Japanese-style site supervision.

BIM LOD 500, start to finish

Building information modelling at LOD 500 across design, construction and handover.

Green building certification

A large share of TSG’s projects hold green building certification, TSG reports.

Specialisms

Sector Experience

Share of TSG's projects by sector, as TSG reports it.

Food-grade facilities35%
Electronic cleanrooms28%
Biopharmaceutical plants20%
Automotive component factories17%
TSG construction site team

TSG site team. Photo: TSG.

Scope

One Contractor From Plan to Handover

TSG works as an EPC (engineering, procurement and construction) contractor, so one team carries a project from feasibility to maintenance.

  1. 01

    Investment planning

    Feasibility analysis, cost budgeting and interpretation of local policy.

  2. 02

    Design

    Architectural, structural and MEP design, with a compliance review.

  3. 03

    Procurement

    Global and local supply-chain management, with quality control on materials.

  4. 04

    Construction

    On-site construction, prefabricated assembly, safety management and schedule control.

  5. 05

    Handover and maintenance

    Final acceptance, then two years of maintenance after completion.

Saraya Lombok

TSG's Role on Saraya Beach Resort

Saraya Beach Resort is delivered through a three-layer model. Kinnara Capital governs the development, Zhongqi Huapu (part of Hua Chuang Group) sets the construction methodology and runs procurement, and TSG carries out the work on the ground.

Phase 1 MEP works are underway, and the base programme targets practical completion by April 2028. Progress is tracked on our development timeline.

Building a Factory in Indonesia?

Kinnara Capital helps investors find and secure industrial land, then brings TSG in for design and build. Read how it works in our industrial estate advisory.

  • Site search and due diligence
  • Permits and approvals
  • Design and build with TSG
Discuss Your Project

Sources: PT TSG Construction Indonesia company profile (March 2026); Kinnara Capital × Hua Chuang Strategic Partnership Investor Profile 2026, section 06. Project figures, sector shares and client retention are TSG's own and have not been independently audited. Photos are of TSG projects and are supplied by TSG.